To Do - Electronics
Install LV, HV umbilicals and distribution boxes
- Priority: Medium
- Pre 2/15? Yes/ No (see notes below)
- Notes:
- We should have pieces prior to 2/15.
- Installation inside square beam hole must happen prior to 2/15.
- Remainder can be installed by on controlled accesses.