To Do - Electronics
Install AC power, fiber runs (44 fibers/arm) and ARCNet runs (1/arm).
- Priority: Medium
- Pre 2/15? Yes
Install cable trays for lower large and all small panels.
- Priority: Medium
- Pre 2/15? Yes
- Notes:
- Upper trays need scaffolding, can’t be done in time.
- Need more complete drawings of where things go (AT, VC)
- Will order trays soon.