PPT Slide
Day 1 Configuration
Year 1:
South arm ready Mar 2000
2/3 gaps at station 3
instrumented (descope)
3 gaps mechanically
No anode wire readout
(deferred)
Year 2+:
North arm ready Aug 2000
Anodes instrumented (?)
M. Brooks, 22-Jun-98
Collaboration Meeting
Engineering
Run
Previous slide
Next slide
Back to first slide
View graphic version