Charge to the Committee
Does the proposed conceptual design fulfil the PHENIX Online system requirements?
Does the proposed conceptual design fulfil the MuID chamber detector requirements?
Does the proposed conceptual design fulfil the level one trigger requirements?
Does the current MuID FEE team have adequate resources and are they appropriately organized to meet near-term goals?
Is the proposed schedule feasible and adequate?