To Do - Gas
Instrument MuID portion of the mixing house
- Priority: High
- Pre 2/15? No
- Notes:
- L. Kotchenda, et al. will be doing this work.
- Plan is to be complete (at least CO2 portion) by April.
Install “E-manifold”
- Priority: High
- Pre 2/15? Yes/No (see notes below)
- Notes:
- That portion of the E which goes into the square beam hole must be installed prior to 2/15.
- The remainder can be installed on controlled accesses.