In the muon sector:
Acceptance for single muons:
-2.3<eta<-1.1
1.1<etaɚ.4
per RHIC year at design luminosity of 2E26 cm-2s-1
higher luminosities require combined Level 1 and 2 triggers
First muon arm (south) begins data taking in year 2
Previous slide
Next slide
Back to first slide
View graphic version