OTHER ISSUES: DCM interface


In order to prepare for a full system test, we have started mapping out what it takes, in terms of hardware, to do this test.


The picture below is of some of the MVD optical and electrical connections to the VME crate that houses the transition modules (between MVD and DCM), as well as trigger- and timing-and-control modules.


Below is a block diagram of the logical layout of functional modules for the full test. A lot of the hardware does not exist yet.