Beam Test Setup
At the CERN SPS H6 beam line from Aug.29 to Sep.5 1998
(by sharing beam with ALICE/Phos group)
Absolute Beam Momentum 0.6% at 40GeV/c
(from uncertainties of magnet current and alignment)
Beam Momentum bite 0.6-0.8% (adjustable with slits setting)
Separated e / p beam (p/e < 1% ) was achieved by target & absorber setting and by CEDAR(differential ?renkov)
- DWC(Delayline Wire Chamber) - position measurement.