DCM STATUS (SCHEDULE)
DCM STATUS (SCHEDULE)
Chain Test between TOF and DCM is starting
DCM-T duaghter card (for TEC) has been fabricated. FPGA program is about to be done and soon to be tested.
Partition Module, output to EVB, design is started.
Previous slide
Next slide
Back to the first slide
View Graphic Version