TOF FEE STATUS
TOF FEE STATUS
Prototype PHENIX TOF interface built.
TOF FEM 2nd Production phase started
Expected to finish in 4-6 months.
Timing/Calibration modules need to be designed and fabricated.
Previous slide
Next slide
Back to the first slide
View Graphic Version