16 July 1999 1100hrs:
Closed orbit for Gold beam achieved for the RHIC Blue Ring.
16 July 1999 1400 hrs:
Beam Captured by the RHIC RF in the Blue ring.
02 August 1999 0300 hrs:
ACCELERATION to the top of the mini-ramp in the BLUE Ring has been achieved.
05 August 1999
Beam life in the RHIC Blue Ring at Injection energy extended to more than 45 minutes.
08 August 1999 1530 hrs:
Over 120 complete turns of beam seen in the YELLOW ring.
12 August 1999
RHIC has been declared OPERATIONAL by DOE.
14 August 1999
Beam Captured at injection by the RHIC RF in the YELLOW ring at a frequency
42 Hz (1 mm in radius ) different from the beam in the BLUE Ring.