On the morning of September 23,
1999 the first sector of
TEC /PC3 was installed on the
East Carriage of PHENIX.
The 14,000 channel, 1 ton detector
element was prepped,
the crew was well rested and
eager, the weather was clear with temperatures in the low 80's. Only gravity
stood in our way! Once we realized we could use the crane we were not to
be denied.
Going Up....
Higher and higher still
A little too high, lets find a place to put this down

This place will do nicely

Don't bother with the bolts, lets get some coffee
Its Miller Time...