Muon Tracker Production Electronics Testing Information (South Arm)
Board Testing Document (Word document)
- Instructions for first level of board testing.
Board Testing Document (Word document)
- Instructions for second level of board testing.
cntl_production.xls
- Control Board Test Results. Visual inspection,
smoke test, ARCNet communication,
serial string tests, check DC level
data, check pulse injection data.
croc_production.xls
- CROC Board Test Results. Visual inspection,
smoke test, serial string tests,
check DC level
data, and check pulse injection data.
arcnet.xls
- ARCNet board test results.
mutr_s1_map.xls
- Location of CROCs and CNTL boards in Station 1.
mutr_s2_map.xls
- Location of CROCs and CNTL boards in Station 2.
mutr_s3_map.xls
- Location of CROCs and CNTL boards in Station 3.
node_map.xls
- Distribution of ARCNet nodes in the South Arm.