Muon Tracker Production Electronics Testing Information (South Arm)



Board Testing Document (Word document) - Instructions for first level of board testing.

Board Testing Document (Word document) - Instructions for second level of board testing.

cntl_production.xls - Control Board Test Results. Visual inspection, smoke test, ARCNet communication,
      serial string tests, check DC level data, check pulse injection data.

croc_production.xls - CROC Board Test Results. Visual inspection, smoke test, serial string tests,
      check DC level data, and check pulse injection data.

arcnet.xls - ARCNet board test results.

mutr_s1_map.xls - Location of CROCs and CNTL boards in Station 1.

mutr_s2_map.xls - Location of CROCs and CNTL boards in Station 2.

mutr_s3_map.xls - Location of CROCs and CNTL boards in Station 3.

node_map.xls - Distribution of ARCNet nodes in the South Arm.




This page is maintained by Andrew Hoover,
address comments to andhoove@nmsu.edu