pbscint1 5/18/94
ACTION ITEMS:
PRIMARY CONCERNS:
1. All fasteners and structural materials affecting structural
integrity, or safety in operation, support, handling, transporting
or hoisting and lifting, must be U.S. certified or documentation
supplied to establish acceptability to BNL's satisfaction. IHEP
2. Provide design, stress analysis, and material certification
for any special handling devices. IHEP
3. The radial budget conflicts must be resolved. IHEP & BNL
4. Installation and handling provisions for both PbSc & PbGl
must be defined. Determine what if any, special handling devices
are required for both the Lead glass and Lead Scintillator sectors.
IHEP & BNL
SECONDARY CONCERNS:
PbSc & PbGl:
1. Systems provisions for air cooling interface with the EmCal
segments should be discussed. BNL/IHEP
2. An organized change control procedure must be formulated. IHEP
3. Provisions to interface with the support carriages must be
better defined for both the Pb Glass and Scintillator. Interfaces
of particular concern are the location and configuration of the
support pins and commonality of support pads on both the PbSc
& PbGl sectors/walls, cable and piping routing, and air conditioning
duct connections and routing. IHEP & BNL
4. The FEE physical space and readout board configuration as well
as the method of installation must be defined. IHEP,BNL &
ORNL
5. An Electrical Engineering review of safety critical items is
needed of the two HV power supply concepts. Mechanical concerns
are form, fit, and envelope BNL
6. Requirements for survey reference points on both the PbSc &
PbGl must be established and included in the assembly/installation
plan. IHEP & BNL
PbSc:
1. All electronically made assembly drawings will be brought
to correct scale no later than the proposed September Safety Review.
IHEP
2. Hard copies of all drawings with complete signatures will be
supplied by the proposed Sept Safety Review. IHEP
3. A test plan will be developed to determine the structural characteristics
and failure modes of a PbSc module. IHEP & BNL
4. Drawing title blocks must include identification of the project
and the institutes involved. IHEP
5. The 024 & 025 bolt drawings should be combined into one
common design. IHEP
6. U.S. procured standard (non-metric) swivel hoist rings will
be used for hoisting the EmCal sectors. U.S. standard (non-metric)
thread taps will be procured where required. IHEP BNL will
provide standards/catalog material.
7. The degree of light protection needed around the photo multiplier
tube contacts for effective tube operation should be determined.
IHEP & BNL?
8. The air cooling duct on the PbSc will have to be re-designed to fit within the radial clearance envelope.
9. The optical connector at the module front plate (Pb Sc) should
be redesigned. Edward Kistenev suggests that it match standard
AMP plastic fiber connectors. IHEP
10. To avoid transportation/handling problems, the fiber bundle
should end up flat with the super module back plate. IHEP
11. Recommend that the support stand proposed for use in the final
assembly of the super module at BNL should include wheels. IHEP
PbGl:
1. Provisions for air cooling should be defined for the Lead Glass.
BNL
2. Lead Glass design should be reviewed by TOF and Lead Glass
specialists. Cern , ORNL& Nevis
3. The actual projection of the Lead Glass front cover should
be checked. BNL & CERN
4. A joint Russian and US engineering visit to Cern should be
considered. BNL
5. Request drawings, material, analyses and test data from Cern for the Lead Glass design. BNL